Review bars and CI

The two bars a change is reviewed against — one for a ticket going into a design branch, one for a design branch going into main — and what checks them today. It is a reference page under the SDLC; how a review runs is the Review stage.

The two bars

Bar Applies to Asks
Task bar A ticket going into a design branch, and a direct pull request Acceptance criteria pass, the constraints of the boxes it touches hold, gates green, the system still works.
Drift bar A design branch going into main The code does what the docs claim, every expand–migrate–contract finished, no old path left beside its replacement.

CI

There is no CI yet. The repository has no CI configuration — no .github/ folder, no workflow of any kind — so nothing runs on a push or a pull request. The gates in AGENTS.md (cargo fmt --check, cargo clippy --all-targets -- -D warnings, cargo test) are run by hand, by whoever is about to merge or open a pull request; Developing devpage shows them. What CI should run on, and when, is not designed yet.